Skip to content

REAL TIME Interview Questions

TOP Interview Questions Answers

  • Home

68 Waste Water Treatment Plant Operator Interview Questions

WASTE WATER Engineering Interview Questions

Posted on April 26, 2020April 26, 2020 by Real Time Interview QuestionsComments Off on WASTE WATER Engineering Interview Questions

100+ TOP WASTE WATER Engineering Questions and Answers Q No: 1 For a continuous flow type of sedimentation tanks A. Width of the tank is normally kept about 6 m B. Length of the tank is normally kept 4 to 5 times the width C. Maximum horizontal flow velocity is limited to 0.3 m/minute D….

Recent Posts

  • ENGINEERING MECHANICS LAB VIVA Questions
  • ENGINEERING GRAPHICS LAB VIVA Questions
  • ENGINEERING DRAWING LAB VIVA Questions
  • Concrete Technology LAB VIVA Questions
  • AUTOCAD LAB VIVA Interview Questions




Categories

Copyright 2021 , REAL TIME Interview Questions , Theme by Discount Promo Codes